How much can actually be built here, and what is stopping it being more?
Parcel area is computed from the boundary geometry and compared against the recorded area. Where the two disagree by more than a tolerance, the disagreement is raised as an analysis limitation rather than averaged away — because a ten-percent difference in lot area is a ten-percent difference in everything downstream.
The area a floor-area-ratio rule charges, the gross building area that gets constructed, and the net sellable or rentable area that produces revenue are three different quantities. Conflating them is the most common way a feasibility estimate goes quietly wrong, so Civexa reports them as separate lines with the efficiency between them stated.
A given envelope supports more than one programme. Civexa generates candidates across unit sizes and forms, then ranks them on published, weighted criteria — regulatory certainty first, physical fit second, unit count third. Floor area alone is never the objective, and the recommendation explains what actually decided it, including where the runner-up scores higher.
Where the site-constrained figure is tighter than the code limit, the site governs — and the report says so. That is the difference between a number you can act on and a number you have to re-derive before you can.
The legal figure and the site-constrained figure appear side by side, with the binding one identified.
Illustrative figures from a real Civexa run. Run your own address for live, code-traced numbers.
A model that always produces a number is a model whose confident answers cannot be told apart from its guesses. These are the cases where Civexa reports a gap instead.
Test whether the programme physically fits the buildable area.
See massing →The rules that set the ceiling in the first place.
See the rules →Whether the programme is worth building at this price.
See feasibility →