See massing →Seven raw map layers sitting beside each other are not a site analysis. Civexa turns them into constraints with geometry, severity and evidence — and measures what they actually take off the ground.
Which part of this property can realistically be developed, and what has to be verified before anyone commits money?
A wetland, its buffer and a steep slope routinely occupy the same ground. Adding their areas together invents lost land and makes a viable site look marginal. Civexa unions the geometry, reports the developable remainder, and states the overlap the union removed so you can see the correction being made.
Constraints are classified as hard, conditional, soft or informational, and only a hard constraint removes ground. Conditional land stays countable with the condition attached — because calling a wetland-buffer review unbuildable is as wrong as ignoring it.
If the flood service is unreachable, the report says the flood layer was not screened. It does not say the parcel is outside the flood zone. A hit with no usable geometry is reported and explicitly NOT deducted, with the usable area called optimistic by an unknown amount.
This is the distinction the whole engine is built around: the difference between a clear site and an unexamined one.
Each unresolved item names the discipline that would settle it — a geotechnical engineer, a wetland biologist, a surveyor — and the drivers that raised it. The output is a list of what to commission, in the order the money should be spent.
Measured constraint geometry, the union correction, and the layers that were not reached.
Illustrative figures from a real Civexa run. Run your own address for live, code-traced numbers.
A model that always produces a number is a model whose confident answers cannot be told apart from its guesses. These are the cases where Civexa reports a gap instead.
The envelope solved against this constraint geometry.
See massing →What the remaining ground supports.
See capacity →How Civexa decides what it is sure of.
Read the methodology →